Go Back   2023 2024 Courses.Ind.In > Main Category > Main Forum

  #1  
Old December 1st, 2015, 10:17 AM
Super Moderator
 
Join Date: Apr 2013
Default DMRC Hyderabad

Discuss about dmrc Hyderabad here. Welcome to Courses.ind.in and this page is for dmrc Hyderabad discussion. If you are looking for information on dmrc Hyderabad then ask your question is as much details as possible in the “Reply” box provided below. The more detailed your question will be, the more easy will it be for our experts to answers your query. And if you have any updated or latest information on dmrc Hyderabad, then please share you knowledge with our experts in the “Reply” box below. Your reply will be published here and your knowledge can help many people. Thanks for stopping by at Courses.ind.in. Please visit again.
Reply With Quote Quick reply to this message
  #2  
Old February 20th, 2018, 08:22 AM
Unregistered
Guest
 
Default Re: dmrc Hyderabad

Hii sir, I Wants to know is Hyderabad Metro is a Project of the Delhi Metro Rail Corporation ?
Reply With Quote Quick reply to this message
  #3  
Old February 20th, 2018, 08:23 AM
Super Moderator
 
Join Date: Aug 2012
Default Re: dmrc Hyderabad

No, the Hyderabad Metro is Not A Project of the Delhi Metro Rail Corporation It is a Project of &T Metro Rail Hyderabad Limited , They are responsible for construction, operation and maintenance of this Project which is built on PPP Basis.

About the Hyderabad Metro :”
Hyderabad Metro is a rapid transit system, serving the city of Hyderabad.[3] It is in Secant Operational model. It is being implemented entirely on public-private partnership (PPP) basis, with the state government holding a minority equity stake

Construction
The construction of the entire 71.16 km has been split into 6 stages with the first stage originally scheduled to be completed by March 2015

In November 2013, L&T Hyderabad Metro started laying of rails on the metro viaduct between Nagole and Mettuguda, a stretch of 8 km.

The first highly sophisticated train of the Hyderabad Metro Rail (HMR) came from Korea during the third week of May 2014. Stringent trial runs commenced from June 2014 till February 2015.

The trial runs started on the Miyapur to Sanjeeva Reddy Nagar stretch in October 2015.

CMRS inspection for Stage-II (Miyapur and S.R.Nagar Section) was done on 9, 10 August 2016.

Three interchanges are planned at Mahatma Gandhi Bus Terminus, Parade Grounds and Ameerpet.

The steel bridge of the HMR was successfully placed over the Oliphant bridge in August 2017
Reply With Quote Quick reply to this message
Reply
Similar Threads
Thread
cmd of dmrc
Interactive DMRC Map
Ayesha DMRC
Map of DMRC Network
DMRC IT Manager
dmrc bid
deputation in dmrc
dmrc upsc
dmrc govt in
who is the president of dmrc
dmrc map with fare
dmrc tagline
syllabus for dmrc sc to
dmrc/om/hr/i/12
state bank of hyderabad branches at hyderabad
ca job in dmrc
dmrc salary
dmrc je civil
cpm of dmrc


Quick Reply
Your Username: Click here to log in

Message:
Options



All times are GMT +5.5. The time now is 05:59 PM.


Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.
Search Engine Friendly URLs by vBSEO 3.6.1
vBulletin Optimisation provided by vB Optimise (Lite) - vBulletin Mods & Addons Copyright © 2024 DragonByte Technologies Ltd.