Go Back   2023 2024 Courses.Ind.In > Main Category > Main Forum > Sathyabama Institute of Science and Technology BE EEE SEEA3009 Power Plant Instrumentation Syllabus

Thread: Sathyabama Institute of Science and Technology BE EEE SEEA3009 Power Plant Instrumentation Syllabus Reply to Thread
Your Username: Click here to log in
Title:
  
Message:
Trackback:
Send Trackbacks to (Separate multiple URLs with spaces) :
Post Icons
You may choose an icon for your message from the following list:
 

Additional Options
Miscellaneous Options

Topic Review (Newest First)
December 18th, 2020 11:31 AM
ReenaK
Sathyabama Institute of Science and Technology BE EEE SEEA3009 Power Plant Instrumentation Syllabus

Sathyabama Institute of Science and Technology BE EEE SEEA3009 Power Plant Instrumentation Syllabus

SATHYABAMA INSTITUTE OF SCIENCE AND TECHNOLOGY SCHOOL OF ELECTRICAL AND ELECTRONICS ENGINEERING

SEEA3009 POWER PLANT INSTRUMENTATION
L T P Credits Total Marks
3 0 0 3 100

UNIT 1 INTRODUCTION 9 Hrs.
Brief survey methods of power generation - hydro, thermal, nuclear, solar and wind power - Importance of instrumentation in
power generation - Piping and instrumentation diagram of a thermal power plant - Boiler types - water tube - fire tube -
fluidized bed - Fuels - coal, fuel oil, natural and petroleum gas, synthetic fuels and biomass - Combustion process -
Combustion of solid fuel, Combustion of fuel oil, combustion of gas – Cogeneration.

UNIT 2 MEASUREMENTS IN POWER PLANTS 9 Hrs.
Metal temperature measurement in boilers, piping system for pressure measuring devices, Flow of feed water - fuel, air and
steam with correction factor for temperature and pressure - smoke and dust monitor, flame monitoring. Drum level
measurement - Radiation detector - Introduction to turbine supervising system - pedestal vibration - shaft vibration -
eccentricity measurement. Installation of non-contracting transducers for speed measurement - rotor and casing movement
and expansion measurement.

UNIT 3 CONTROL LOOPS IN BOILER 9 Hrs.
Combustion Control -air/fuel ratio control - furnace draft control - drum level control- main stream and reheat steam temp
control - super heater control - attemperator - de-aerator control - distributed control system in power plants - interlocks in
boiler operation- Problems associated with control of multiple pulverizers - Fan drives and control.

UNIT 4 ANALYZERS IN POWER PLANTS 9 Hrs.
Coal analyzer- thermo-gravimetri - gross calorific value - total sulphur analysis - ash analyzer - online monitor - air quality
monitoring - Sampling of ambient air - general air sampling system - Flue gas oxygen analyzer - analysis of impurities in
feed water and steam - dissolved oxygen analyzer - chromatography - pH Meter - pollution monitoring instruments.

UNIT 5 NUCLEAR POWER PLANT INSTRUMENTATION 9 Hrs.
Introduction - Energy from nuclear reaction - Nuclear fission and fusion - Neutron flux and reaction rate - Types of reactor -
pressurized water reactor - boiling water reactor - Nuclear waste disposal - Piping and instrumentation diagram of different
types of nuclear power plant - Nuclear reactor control loops - reactor dynamics - excess reactivity - pulse channel and
logarithmic instrumentation - control and safety instrumentation - reliability aspects.
Max. 45 Hrs.

COURSE OUTCOMES
On completion of the course, student will be able to
CO1 - Summarize the methods of power generation and combustion process.
CO2 - Illustrate the measurement of various parameters in a power plant and working of Nuclear power plant.
CO3 - Select the appropriate control techniques for boilers.
CO4 - Compare the different analyzers used in power plant.
CO5 - Judge the various measurements in different types of power plants.
CO6 - Plan for measurement and control techniques in power plants.

TEXT / REFERENCE BOOKS
1. Gill A.B, “Power Plant Performance”, 6th Edition, Butterworth, London, 1984.
2. Liptak. B.G, Analytical Instrumentation, Vol 1 & Vol 2, Chilton Book Company, 1994.
3. Nag P.K ?Power Plant Engineering? , 2nd Edition, Tata McGraw Hill, 2001.
4. Sam Dukelow. G “The control of Boilers”, 2nd Edition, Instrument society of America, 1991.
5. Elonka S.M, Kohan A.L, “Standard Boilers Operations”, McGraw Hill, New Delhi, 1994.
6. Wakil. E.A Power Plant Engineering, Tata McGraw Hill, 1984,
7. David Lindsley, “Boiler Control Systems”, McGraw Hill, New York, 1991.
8. Jain. R.K, “Mechanical and industrial Measurements”, Khanna Publishers, New Delhi, 1995.

END SEMESTER EXAMINATION QUESTION PAPER PATTERN
Max. Marks: 100 Exam Duration: 3 Hrs.
PART A: 10 Question of 2 marks each – No choice 20 Marks
PART B: 2 Questions from each unit of internal choice; each carrying 16 marks 80 Marks

Posting Rules
You may post new threads
You may post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off


All times are GMT +5.5. The time now is 07:41 PM.


Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.
Search Engine Friendly URLs by vBSEO 3.6.1
vBulletin Optimisation provided by vB Optimise (Lite) - vBulletin Mods & Addons Copyright © 2024 DragonByte Technologies Ltd.