#1
| |||
| |||
![]() |
#3
| |||
| |||
![]()
L&T Metro Rail Hyderabad Limited is the Concessionaire for this Project. They are responsible for construction, operation and maintenance of this Project which is built on PPP Basis. Yes L&T Metro Rail (Hyderabad) Limited is a subsidiary of L&T IDPL, promoted by Larsen & Toubro Limited, L&T Metro Rail Hyderabad Limited profile : Owner Government of Telangana, L&T Locale Hyderabad, Telangana, India Transit type Rapid transit Number of lines 2 (Operational) 3 (Phase I) Number of stations 24 (Operational) 64 (Phase I) Headquarters Metro Bhawan, Begumpet, Hyderabad Operation Began operation 29 November 2017 Operator(s) Hyderabad Metro Rail Ltd. (HMRL) Technical System length 30 km (19 mi) (operational) 66.56 km (41.36 mi) (Phase I) 97 km (60 mi) (Phase II - Planned) No. of tracks 2 Track gauge 1,435 mm (4 ft 8 1⁄2 in) standard gauge Electrification 25 kV, 50 Hz AC through overhead catenary Average speed 35 km/h (22 mph) Top speed 90 km/h (56 mph) |
![]() |
|